加勒比hezyo一本道无码av|中文字幕无码亚洲日韩|久久久久久国产精品无码APP|91精品国产色综合久久不8|

MySE5.5-155

Date: 2024.02.23

The two MySE5.5-155 wind turbines are located at the positions of Y8 and Y9 in Xinghuawan Bay Wind Farm. The monthly generation of November of Y8 is around 2,400MWh.Moreover, the total generation after grid-on half year ago is around 11210MWh,while the equivalent generation hours of above-rated operation is 2040 hours, superior to those of all other wind turbines integrated into the grid simultaneously. The wind turbine at the position of Y9 has performed almost the same result as Y8 since it was integrated into the grid three months ago, which demonstrates the robustness, efficiency and reliability of MySE5.5-155 wind turbines.

神池县| 襄樊市| 昭通市| 肥东县| 磐安县| 堆龙德庆县| 桑植县| 南雄市| 安丘市| 大连市| 丹东市| 九寨沟县| 阜阳市| 万州区| 玉环县| 泽库县| 峡江县| 东莞市| 阳新县| 行唐县| 井冈山市| 屯昌县| 岐山县| 辽宁省| 义马市| 枞阳县| 胶州市| 丹棱县| 岑溪市| 夹江县| 荔浦县| 临江市| 井陉县| 晋宁县| 阿鲁科尔沁旗| 台前县| 邳州市| 博爱县| 北碚区| 墨竹工卡县| 南京市|